Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system.
dc.contributor | New Jersey State Library | |
dc.date.accessioned | 2024-07-03T17:23:32Z | |
dc.date.available | 2024-07-03T17:23:32Z | |
dc.description.abstract | Year: 2017, Chapter: 139 | |
dc.identifier.uri | https://hdl.handle.net/10929.1/32076 | |
dc.title | Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system. | |
dc.type | Legislative History | |
lg.NJSA | 48:3-87 | |
lg.billNumber | S3181 ScaAa (2R) | |
lg.chapter | 139 | |
lg.njlhid | L2017c139 | |
lg.synopsis | Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system. | |
lg.title | Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system. | |
lg.yearEnacted | 2017 |
Files
Original bundle
1 - 1 of 1